Finish a corrugated bitumen sheet roof properly with matching bitumen ridges, gable angles (verges) and wall abutment flashings. These trims are made for our corrugated bitumen roofing sheets and other corrugated bitumen sheets of the same profile. Ridges and gable angles come in black, green, red and brown to match your sheets, and the wall flashing comes in charcoal. Pick the trim and colour you need above.
Which roof trim do I need?
- Bitumen ridge (850mm): caps the apex of a pitched roof where the two slopes meet, keeping rain out of the joint. It has corrugated edges that sit over the waves of the sheets.
- Gable angle / verge (850mm): an angled trim that covers the cut edge of the sheets down the gable end of an apex or pent roof. It protects the sheet edge and gives a straight, finished line.
- Wall abutment flashing (950mm, charcoal): seals the joint where a lean-to or pent roof meets a wall. The upstand fixes to the wall and the corrugated lower edge dresses over the sheets.
Specification
| Trim | Length | Colours | Material |
|---|---|---|---|
| Ridge | 850mm | Black, green, red, brown | Corrugated bitumen |
| Gable angle / verge | 850mm | Black, green, red, brown | Bitumen |
| Wall abutment flashing | 950mm | Charcoal | PVC |
How many do I need?
Ridges and gable angles are 850mm long. Allow for a lap of around 150mm between pieces, which gives an effective length of about 700mm each. Divide the length of the ridge or gable edge by 0.7m and round up. Example: a 2.6m apex shed ridge needs 4 ridge pieces. For gable angles, measure each sloping gable edge and remember an apex roof has four. Wall abutment flashings are 950mm long, so divide the wall length by about 0.8m to allow for laps.
How to fit bitumen ridges and verges
- Ridge: fit after the sheets. Start at the end facing away from the prevailing wind and lap each ridge over the last by about 150mm. Nail through the crowns of the ridge corrugations into the top batten on each side using bitumen sheet fixings.
- Gable angle: fit from the eaves upwards so each piece laps over the one below. Fix through the top face into the sheet crowns and through the side face into the barge board.
- Wall flashing: fix the upstand to the wall, then nail the corrugated lower edge through the sheet crowns. Seal the top of the upstand to the wall with a suitable exterior sealant.
Delivery
Free UK mainland delivery on all ridges, gable angles and flashings, typically 3–5 working days by specialist courier. Order them with your bitumen roofing sheets and they arrive together.
Complete your roof
Seal the eaves with corrugated eaves fillers and fix everything with bitumen sheet fixings.