These eaves fillers for corrugated bitumen roofing sheets close off the open waves at the bottom edge of the roof. Fitted under the sheets along the eaves, the black foam strips follow the corrugated profile and seal the gaps against birds, wasps, rodents, wind-driven rain and draughts. Each pack contains 10 eaves fillers, 925mm long, covering 9.25m of eaves. They suit our corrugated bitumen roofing sheets and other corrugated bitumen sheets of the same profile.
Eaves filler specification
| Length | 925mm per filler |
| Pack quantity | 10 eaves fillers |
| Pack coverage | 9.25m of eaves |
| Material | Closed-cell foam |
| Colour | Black |
| Profile | Matches corrugated bitumen roof sheets |
Why fit eaves fillers?
- Keep birds and pests out: open corrugations are an easy way in for nesting birds, wasps and mice.
- Stop wind-driven rain: fillers block rain and snow being blown up under the sheets.
- Reduce draughts: ideal for stables, workshops, garden rooms and sheds used for storage.
- A neater finish: the eaves line looks closed and professional rather than open and ragged.
How many eaves fillers do I need?
Measure the length of each eaves (the low edge of the roof) and divide by 0.925m, then round up. A typical 8ft shed with an eaves of about 2.6m needs 3 fillers, so one pack of 10 covers several small buildings, or both eaves of a building up to around 4.5m long. On an apex roof, remember to count both sides.
How to fit eaves fillers
- Fix the eaves batten or fascia so its top edge is level.
- Lay the eaves filler along the batten with the waves lined up with the sheet corrugations. Butt the ends of each filler tightly together.
- Lay the first row of bitumen sheets on top so the corrugations sit into the filler.
- Nail through the crown of the sheet and filler into the batten using bitumen sheet fixings, which hold the filler in place.
Fillers can also be fitted at the top edge of a mono-pitch roof, under a ridge, or where the sheets meet a wall to close off the corrugations.
Delivery
Free UK mainland delivery by Royal Mail Tracked 48, typically 2–4 working days.
Complete your roof
Fix the sheets with bitumen sheet fixings and finish the ridge and verges with matching bitumen ridges and gable angles.
